Introduction to Project Planning &Management

1.1What is Project?
1.2What is Project Management?
1.3Project Phases,
1.4Project Life Cycle,
1.5Project Triangle
1.6Knowledge Areas in PPM
1.7Important terms
1.8Network Analysis Technics

PRIMAVERA User Interface

2.1Graphical User Interface

EPS & OBS

3.1Define Enterprise Project Structure
3.2Define Organizational Breakdown Structure.
3.3Link OBS Elements to EPS

Project

4.1How to Add Project under EPS
4.2Details of various TAB under Project Details

CALENDAR

5.1Calendar Global, Resource, Project.,
5.2Making a Project or resource Calendar as global.
5.3Assigning a Calendar as default for the projects.

Work Breakdown Structure

6.1Introduction to WBS
6.2Define WBS
6.3Details of various TAB under Project Details

ACTIVITY

7.1Add Activity under WBS
7.2Various columns of activity
7.3Various TAB under Activity Details
7.4Time scale Adjustment

Activity linking (Relationship)

8.1Different methods of linking FS, SS, FF, SF
8.2Estimating the project finish date.
8.3Identifying the project critical path
8.4Float /Slack overview

CODE

9.1Project code (Define, Assign, Group &Sort)
9.2Activity code (Define, Assign, Group &Sort)
9.3Resource code (Define, Assign, Group &Sort)

Work Product & Document

10.1Defining WPs & Docs
10.2Assigning it for activities.

Currency & Constraints

11.1Currency
11.2To change the currency
11.3To Create new Currency
11.4Setting exchange rate
11.5Reorganizing Constraints in a Project.
11.6Types of Constraints, Use of Secondary Constraint

Resource Management

12.1Roles, Importance of Roles, Defining the roles
12.2Giving rates for the roles
12.3Resource Sheet Preparation
12.4Defining Resource through Wizard
12.5Roles, Importance of Roles, Defining the roles
12.6Defining Resource through detail
12.7Defining Resource through Calendar
12.8To create new unit of Measure for materials which is not available in the list.
12.9Resource Assigning
12.10Analysis Resources
12.11Resource Usage Profile
12.12Resource Usage Spread Sheet
12.13Resource Curves
12.14Concepts of Stretching, Crunching & Splitting – Manual
12.15Automatic Leveling

Updating Project Progress

13.1Baseline Concept
13.2Variance Analysis
13.3Earned Value Analysis
13.4Concept of S-Curve
13.5Setting Database, Maintain and Assign Baseline
13.6Updating Progress
13.7Entering Actual Start & Actual Finish date for tasks
13.8Updating through duration
13.9Updating through Physical
13.10Cost Updating
13.11Comparative Study of Baseline and Actual Plan
13.12Reflection
13.13Calculating earned Value analysis

Project Threshold & Issue

14.1Threshold
14.2Issue
14.3Issue Navigator

Report Generation

15.1Tabular Report
15.2Graphical report
15.3Report Customization

Import/Export Database

16.1Import filein database
16.2Export file from database
16.3Import another format to Primavera (Excel, MSproject etc.)

Course Quiz

13.1Course Quiz

Hands on Projects

14.1PROJECT -A
14.2PROJECT -B
14.3PROJECT -C

₹ 5600 ₹ 8000 30%off

Register Now

Includes

  • 90+ Effective Video
  • Section vise quiz
  • Training Supporting Material
  • Plug and Learn Anywhere
  • Lifetime Access
  • Course Completion Certificate
Video Tutorial